PI062 | Planned unavailability V4.0
Performance Indicator
This PI captures the ship’s agreed planned unavailability.
Definition | The number of hours planned for repairs and maintenance, including drydocking, in-water survey (IWS), modifications, hot / cold layup that are agreed between the ship manager and ship owner for the given quarter. | ||||||||
Unit | HOURS | ||||||||
Scope | Reported on a ship level | ||||||||
Calculation period | Captured and reported on a quarterly basis. | ||||||||
References | This Performance Indicator - PI062 - is used by the following Key Performance Indicators
|
Example
Quarter1: 18hours (ME maintenance)
Quarter2: 140 hours (100 hours for planned Drydocking plus 40 hours steaming to shipyard),
Quarter3: 4 hours (ME maintenance),
Quarter4: 240 hours (Hot Lay-up)
Total planned unavailability: 402 hours