Select standard
Select between the current version of the KPI Standard and the historic versions
Chapters
PI004 | Agreed drydocking budget V4.0
Performance Indicator
This PI captures ship’s drydocking budget.
Definition | The total budget amount associated with the drydocking as agreed between the ship manager and owner BEFORE the drydocking. This shall include in-water survey (IWS), modifications and repairs, not included in routine running costs. Any additional work which is approved AFTER the drydocking has started shall not be taken into account. | ||||||||||||
Unit | USD | ||||||||||||
Scope | Reported on a ship level | ||||||||||||
Calculation period | Captured and reported in the quarter the drydocking was completed. | ||||||||||||
References | This Performance Indicator - PI004 - is used by the following Key Performance Indicators
|
Example
Agreed drydocking budget in US$ = 4 000 000