PI002 | Actual drydocking duration V4.0
Performance Indicator
This PI captures the ship’s actual drydocking duration.
Definition | The Actual Drydocking Duration. This shall include in-water Survey (IWS), modifications and repairs. | ||||||||||||
Unit | DAYS | ||||||||||||
Scope | Reported on a ship level | ||||||||||||
Calculation period | Captured and reported in the quarter the drydocking was completed | ||||||||||||
References | This Performance Indicator - PI002 - is used by the following Key Performance Indicators
|
Example
Actual drydocking duration = 16.4 days