Select standard
Select between the current version of the KPI Standard and the historic versions
Chapters
PI002 | Actual drydocking duration V3.0
Performance Indicator
This PI captures the ship’s actual drydocking duration.
Definition | The Actual Drydocking Duration. This shall include in-water Survey (IWS), modifications and repairs. | ||||||||||||
Unit | DAYS | ||||||||||||
Scope | Reported on a ship level | ||||||||||||
Calculation period | Captured and reported on a quarterly basis | ||||||||||||
References | This Performance Indicator - PI002 - is used by the following Key Performance Indicators
|
Example
Actual drydocking duration = 16.4 days